Construction began March 5, 1927, with the demolition of the existing buildings and excavation of a hole 40 feet deep at the site. Work did not even pause when gold--or at least traces of it--were found during the digging. Workers simply panned for gold during their lunch hour.

The builders were the C.E. Walker Construction Company of Denver. They pretty much followed the architectural plans for the building, and it was a massive undertaking. The new building would cover 25,000 square feet of ground. It was set on concrete column footings 8 feet thick, used 4,000 tons of steel and 1,800 tons of terra cotta, included 40 miles of lighting conduit and 80 miles of wire, and contained 1,000 windows and 1,000 doors. And it had to be completed in two years.

The building ended up being 236 feet high; normally, this would have resulted in a 24-story building, but in this case there were only 15 stories. What happened to the missing floors? Higher than usual ceilings were required to accommodate the step switches (which were, of course, one of the primary reasons for building the building). This introduced another issue: six of these switches were required to make a single call, and while each weighed just 22 pounds (roughly as much as a cocker spaniel, Boston terrier, or other small-ish dog), the new building was supposed to accommodate 40,000 simultaneous phone calls—using 240,000 switches, weighing in at a hefty 5,280,000 pounds (2,640 tons, or about 1,200 Ford Explorer SUVs, or 240,000 cocker spaniels), all piled up in relatively little space. The stacks of switches were 11 feet high, requiring a 16' ceiling to accommodate the cabling and access space necessary above the switches. (Click here for a demonstration of this type of switch in action.)

Needless to say, the floors had to be made of pretty strong stuff to hold the switches. These floors were made of reinforced concrete and steel, and were made extra thick. Several such reinforced floors were required for the switches. Where possible, local materials were used in construction, partly to follow the Bell System’s architectural ideas and partly because this made it easier to haul the tons of materials necessary to the site. The granite base used in the street sides of the building came from the Platte Canyon; the walls in the lobbies (Curtis St and 14th St), the business office, and employee entrance were of Colorado travertine; most of the steel structure was rolled in Pueblo mills; and the terra cotta used for facing was manufactured in Denver. Other materials and their locations: The finishing touches came by May 1929, and Denver's "cut-over" to dial service using the step switches took place on May 4, when all of downtown Denver's phones started using the new service. By July 29 the building was fully occupied and was open for business, and it "officially" opened to the public on August 6, 1929—less than three months before the stock market crashed.

To learn more about how this building was designed, built, and used, click on the links below. To continue a Guided Tour, click here.

Slideshow above, right: Images from various stages of construction of the 931 building. Click to see larger versions of the slideshow images. (THG archives)

Front of Exhibit
Building Site History
Local History of Communications
Architecture and Construction
Murals
Working in the Palace and Tour
Arapaho and Schooners
Growth of Denver
Skid Row
Building Site Chosen
Smoke Signals
Pony Express
Trains and Telegraphs
Local Phones
The Drawing Board
Construction
In Use
14th St Outer
14th St Inner
Curtis St Outer
Curtis St Inner
And More
Basements
Main Floor
Even Floors
Odd Floors
Fourteenth Floor
Fourteenth Floor Museum
Fifteenth Floor







You are currently in the Architecture & Construction section of the 931 Building exhibit. Please click on the menu items above to move to other parts of the exhibit, or use the menu below to go to other parts of the Telecommunications Virtual Museum.

return to museum entrance | THG main page
site map | educational resources